Wandana to Penong
This section contains information about the Wandana to Penong railway
Wandana 416.1 km (258 m 33 ch)
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Penong Junction 4429.7 km (260 m 70 ch)
13.2.1966 | Opened as junction of new Kevin line |
Temporary Junction (267 m 16 ch)
6.9.1965 | Opened to allow access to new Kevin line under construction |
Chinta 426.5 km (264 m 35 ch)
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Kalanbi 436.5 km (270 m 56 ch)
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Wiabuna 450 km (279 m 28 c)
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Chatana 457.5 km (283 m 54 ch) -- Koonibba 457.5 km (283 m 54 ch)
7.2.1924 | Opened - was named "Chatana" after local homestead, before opening, but changed to "Koonibba" two weeks later[pk] |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
14.2.1966 | Closed. [pk] |
Koonibba 469 km (291 m 5 ch) -- Uworra 469 km (291 m 5 ch)
7.2.1924 | Opened - was named "Koonibba" but changed to "Uworra" when "Chatana" renamed "Koonibba"[pk] |
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Watraba 480.5 km (297 m 72 ch)
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Kowulka 492.5 km (305 m 43 ch)
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Gypsum Fields 501.5 km (311 m) -- Kevin 501.5 km (311 m)
Branches off main line to "Penong" at "Kowulka".
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Penong 500 km (310 m 14 ch)
30.6.1950 | On "Chief Engineer For Railways Map Showing Lines of Railways in South Australia" |
Moule 445.6 km (276 m 77 ch)
Charra 466.2 km (289.5 m)
Gypsum Field 501.5 km (311 m) -- Kevin
11.4.1950 | Opened - 311M via Wandana and Kowulka, 304.2M via Penong Junction |